Giprotyumenneftegaz —
Tyumen V.I. Muravlenko Oil & Gas Scientific Research
and Engineering Company

Enlargement of Pump Station at the Central Gathering Station of the Prirazlomnoye field

Process facilities are designed for supplying commercial oil to Pump Station Karkateevy

The Pump Station infrastructure comprises:
  • Oil pump station;
  • Oil metering station;
  • Tank farm for commercial oil (VST 10000m3; 4 ea.)
  • Condensate tank of gas surge system
  • Safety device site;
  • Pressure control valve site;
  • Leak gathering tank;
  • Stripping pumps;
  • Drain tank;
  • Firefighting facilities;
  • Process building;
  • 35/6kV substation;
  • Packaged modular 6kV SG
  • Utilities.
The site is provided with automation and telemechanics systems for these facilities

 General view Plot Plan Oil pump station building Oil pump station hall General view of Central Gathering Station General view of Central Gathering Station Terminal separation unit 

Authorization

Remember me
Forgot your password?
Register